Milltimber Manor is the latest phase of the prestigious Oldfold Village development on the outskirts of Aberdeen. Designed to blend traditional architecture with modern living, this semi-rural community will comprise 500 luxury homes, meandering streets, stonewall perimeters, community spaces, and a new primary school.

Customer:

Cala Homes

Our solutions:

ElectricityFibreWaterGas

Flexible Multi-Utility Approach

GTC provided a comprehensive multi-utility solution tailored to the specific requirements of the development. While GTC typically handles all groundworks for gas, electricity, water, and fibre, in this instance, CALA Homes opted to undertake the fibre groundworks themselves. GTC then laid the fibre in the prepared trenches, demonstrating flexibility and collaboration to meet the project’s needs.

  • Integrated delivery of electricity, fibre, self-lay water, and gas networks
  • Coordinated installation to streamline construction timelines
  • Adaptable approach to accommodate client preferences

Ultrafast Fibre and Satellite TV for Every Home

GTC installed ultrafast Fibre-to-the-Home (FTTH) infrastructure, delivering 1Gbps speeds available to residents from the day they move in. The open-access fibre network offers homeowners a choice of Internet Service Providers, allowing them to select packages that best suit their needs.

Residents also benefit from GTC’s Fibre Integrated Reception System (FIRS), which uses a single dish and aerial array to provide satellite TV (including Sky Q), Freeview, and DAB radio. The signal is distributed to each home via the fibre network. To complement the high-end nature of the homes, GTC upgraded the RF splitters in each property, enabling television points in up to nine rooms.

Delivering Value Through Partnership

GTC’s collaborative approach ensured that utility installations were completed efficiently and with minimal disruption. Notably, GTC carried out electrical reinforcement works on North Deeside Road, avoiding months of potential roadworks and inconvenience for local residents.

We have a very good working relationship with the GTC team, mainly due to the excellent work of their operations and sales teams. They liaise very closely with our construction teams to ensure all work is scheduled well in advance to afford them adequate time to plan the onsite works efficiently. The onsite works are always well supervised and projects are delivered to programme and budget. They continue to deliver alternative solutions for us, one example being at Milltimber Manor, where they carried out electrical reinforcement works on North Deeside Road, which, had the work been carried out by another provider, would have caused months of road works and disruption for those living locally.
Steve Jarvie, Construction Director at CALA Homes (North)