Installers of vehicle to grid and heat pumps are required to notify the local Distribution Network Operator (DNO) of the installation.

If the combined system load exceeds a certain level, a connection must be applied for in advance.

Please email the completed ENA notification form to [email protected] or call us on 01359 302518.