Installers of electric vehicle (EV) charging points must notify the local Distribution Network Operator (DNO) of the installation.


If the combined system load exceeds a certain level, then a new connection will need to be applied for in advance.

For electric vehicle (EV) charging points, please use our SUREconnect portal.

If you’re experiencing any problems with the portal, call us on 01359 302518.