Do I need to notify or apply for Embedded Generation?
Anyone installing Embedded Generation is required to notify the local Distribution Network Operator (DNO) of the installation.
For all Embedded Generation applications please use our online SUREconnect portal.
If you require any assistance, please email [email protected].
Types of Embedded Generation
- Solar Photovoltaic (PV) rooftop panels
- Wind turbines
- Energy storage systems (e.g battery storage units)