Back to top of page

Application for a Change in Commercial Load

    If you are a commercial customer and wish to change your existing load, please complete the below form. Please note that you can only change your load once within a 12 month period.

    Quotation Type*

    Budget Estimates: If you’re not ready for a formal quotation, a budget estimate is a faster and free way to receive an estimate from ourselves. These estimates are useful for early-stage planning to see what assets we have in the area and will give you an indication of costs but does not include a detailed network assessment. Please note that you are unable to accept a budget quotation.

    Feasibility Studies: A feasibility study is a low-cost quotation which can provide a more accurate cost estimate. These can be useful for customers who have time to consider their options. We provide you with a more detailed network study however you are unable to proceed with acceptance of this study. Fees may apply. A summary of our charges can be found here.

    Formal Quotation Offer: For customers who are ready to connect. This provides you with an accurate cost based on a detailed network study and is inclusive of any necessary surveys we need to undertake. These quotations can be accepted and used to proceed with your application. Please note that timescales may take longer than other quotation options. Fees may apply. A summary of our charges can be found here.

    I Want To:

    The below address needs to be the address where you require a new commercial load