Do I need to notify or apply for Embedded Generation?
Anyone installing Embedded Generation is required to notify the local Distribution Network Operator (DNO) of the installation.
For all Embedded Generation applications please ask your installer to use our online SUREconnect portal.
If your installer requires any assistance with the portal, please call 01359 302518.
For plug-in solar installations please email [email protected] with your installation documents and contact details
Residents that require their DNO letter will need to send their MCS Certificate to [email protected].
Types of Embedded Generation
- Solar Photovoltaic (PV) rooftop panels
- Wind turbines
- Energy storage systems (battery storage units)