Installers of electric vehicle (EV) charging points and solar installations must notify the local Distribution Network Operator (DNO) of the installation.


If the combined system load exceeds a certain level, a connection will need to be applied for in advance.

For electric vehicle charging points and solar installations this can be done through our SUREconnect portal.

If you are experiencing any problems with the portal, please call us on 01359 302518.