If you are an ICP, IDNO or DNO and are looking to apply for a new point of connection or an increase to an existing load, please complete the below form after stating your quotation type. * These fields are mandatory. Quotation Type* Budget EstimateFeasibility StudyFormal Quotation Budget Estimates: If you’re not ready for a formal quotation, a budget estimate is a faster and free way to receive an estimate from ourselves. These estimates are useful for early-stage planning to see what assets we have in the area and will give you an indication of costs but does not include a detailed network assessment. Please note that you are unable to accept a budget quotation. Feasibility Studies: A feasibility study is a low-cost quotation which can provide a more accurate cost estimate. These can be useful for customers who have time to consider their options. We provide you with a more detailed network study however you are unable to proceed with acceptance of this study. Fees may apply. A summary of our charges can be found here. Formal Quotation Offer: For customers who are ready to connect. This provides you with an accurate cost based on a detailed network study and is inclusive of any necessary surveys we need to undertake. These quotations can be accepted and used to proceed with your application. Please note that timescales may take longer than other quotation options. Fees may apply. A summary of our charges can be found here. Please ensure you have the following to hand: Property / address details Details of how much power you require (kVA) Location or site map Name Company Name Invoice Address Email Address Telephone Number Your Reference The below address needs to be the address where you require a new point of connection: Address 1 Address 2 Town County Postcode Connection Type Low Voltage ConnectionHigh Voltage ConnectionExtra High Voltage ConnectionHeat Transformation RequestSelf-Determined Point of Connection (LV)Self-Determined Point of Connection (HV)I’m Unsure Developer Details Load Required (kVA)* Disturbing Load Info Is This A: New ConnectionIncrease to Existing Connection Existing Connection Ref Do You Require An Export Load? NoYes Number of Plots for Export Total Export Capacity Grid Reference – Eastings Grid Reference – Northings Have You Previously Had A Quote From GTC For This Connection Application? YesNo Previous Quote Reference GTC Network Number Number of Connections Number of Plots Are These Connections For DomesticCommercialBoth When Would You Ideally Like Your Power By? Additional Information What would you like us to cost for?* Please selectNon ContestableContestable and Non Contestable Information Upload – Please Upload Any Relevant Documentation, Including A Site Map (if one is available).