Do I need to notify or apply for Embedded Generation?
Anyone installing Embedded Generation is required to notify the local Distribution Network Operator (DNO) of the installation.
For Embedded Generation applications please use our online SUREconnect portal.
For plug-in solar installations please email [email protected] with your installation documents and contact details.
If you require any assistance, please call 01359 302518.
Types of Embedded Generation
- Solar Photovoltaic (PV) rooftop panels
- Wind turbines
- Energy storage systems (e.g battery storage units)