Installers of electrical vehicle (EV) to grid and heat pumps are required to notify the local Distribution Network Operator (DNO) of the installation

If the combined system load exceeds a certain level, a new connection must be applied for in advance.

Please email the completed ENA notification form to [email protected] or call us on 01359 302518.