Case Studies

GTC is a leading independent utility infrastructure networks provider installing new gas, electric, water and fibre to the home utility networks to new housing and commercial developments nationwide.

Please see our latest case study.

Choose a region to find;

    • House builder: Persimmon Homes & St Modwens
    • Development: Former Corus Works, Stockton on Tees
    • Properties: 375 homes and commercial properties

    Utility infrastructure requirements:

    • Gas: 1,800 mtrs onsite mains
    • Electric: 2,650 mtrs onsite cables with over 1,000 mtrs offsite cables and two substations
    • Additional products: Commercial arrangement for a number of developments
    • House builder: Countryside Properties
    • Development: Addenbrooke's Hospital, Cambridge
    • Properties: 2,600 private and social houses with commercial properties

    Utility infrastructure requirements:

    • Gas: Two medium pressure governors and 29,000 mtrs onsite mains
    • Electric: 28,000 mtrs onsite cable and 7 substations
    • Additional products: Primary substation built by our sister company Power on Connections
    • House builder: Persimmon Homes
    • Development: College Road, Cranwell
    • Properties: 35 houses

    Utility infrastructure requirements:

    • Gas: Over 350 mtrs of onsite and offsite mains
    • Electric: Substation required for High voltage network, 300 mtrs onsite and offsite cable
    • Additional products: Sely-lay water product
    • House builder: Barratt Homes
    • Development: Dukes Park, Constantine Way, Bilston
    • Properties: 133 homes plus future residential development

    Utility infrastructure requirements:

    • Gas: 300 mtrs of onsite mains
    • Electric: Over 50 mtrs of offsite cable and over 1,100 mtrs onsite cable
    • Additional products: Temporary Builders Supply (TBS) for site compund and smart meters
    • House builder: Lindum Construction
    • Development: Kyme Road, Heckington
    • Properties: 25 homes

    Utility infrastructure requirements:

    • Gas: Over 300 mtrs of onsite mains
    • Electric: 65 mtrs offsite and 250 mtrs onsite low voltage cable
    • Additional products: Self-lay water and smart meters